Family Open Day
03 June at 11:00-14:00
During the Open Day we offer attractions for children
03 June at 11:00-14:00
During the Open Day we offer attractions for children
Wille Tercja comprise a unique complex of 12 luxury villa apartments in Konstancin (150 to 340 m²) distributed in three buildings. The investment was made with attention to every detail and with the highest-quality materials. We offer development in a prime location and at a good price.
Unique architecture – the buildings of the complex are maintained in the classical style. The external form is ordered and consistent, symmetrical both in projection and elevation sphere The historic character is also given by the strongly marked form of a mansard roof with utility lofts and extensive balconies at the corners of each building. The villas are developed around an internal, square courtyard, the center of which is decorated with an urban composition.
Every apartment has an above-standard space (150,180 to 300 square meters, single or duplex) and a non-standard height exceeding 3.00 m in the light. Such parameters allow a rare opportunity to design interiors with interesting proportions.
In addition, apartments on the ground floor of the villa have terraces and those on the first floor balconies. There is an additional room on each floor (drawing room) for residents’ shared use.
The large area of the complex -7.232 m², including a “green” zone for common use.
The villas are equipped with a lift also accessible from the garage level. A stable temperature is provided by our own modern gas boiler room and individual air conditioning for each apartment.
Each of the three buildings has its own underground garage with a heated entrance. In addition, on the premises of the complex there are 16 parking spaces for guests. Garage spaces in a spacious underground garage: two for the 150-180m² apt., four for 300m apt.
The area is fenced, equipped with a system of 24/7 security (concierge) and monitoring, external cameras, video intercoms and motion sensors.
Developers status. Completion of the investment September 2019.